đ§ Scope of Work â Tasks to be Covered
1ď¸âŁ Build Phase â Pre-Installation Activities:
â
Verify & Validate the Bill of Materials (active & passive components).
â
Receive and Inspect network equipment (switches, APs, controllers, firewalls).
â
Rack and Stack devices in designated positions as per the layout plan.
â
Cable Management: Identify and label network cables for installation.
â
Power Setup: Verify available PDU sockets and install redundant power sources if required.
â
Provide Console Access for Infosys remote engineers to configure the devices.
2ď¸âŁ Cutover Phase â Installation & Migration Activities:
â
Physically replace & install network devices, including:
⢠Switches (Core, Distribution, and Access Switches)
⢠Wireless Access Points (Ceiling/Wall Mounted)
⢠Gateway Controllers
⢠Firewalls
â
Cable Patching:
⢠Perform inter-rack & intra-rack patching with copper and fiber cables.
⢠Ensure neat dressing and labeling of cables inside the racks.
â
Swapping Connections: Migrate endpoint connections from old to new switches.
â
Testing: Conduct power-on and connectivity tests for all installed devices.
â
User Acceptance Testing (UAT): Work with on-site contacts to verify device functionality.
â
Document Installation & Spare Materials: Submit a list of installed devices and leftover materials.
â
Take Before & After Photos of racks, patch panels, and cabling.