We are 50Hertz – one of the four transmission system operators (TSO) in Germany. Together with the Belgian electricity grid operator Elia (Brussels), we form the internationally active Elia Group. At 50Hertz, over 2,100 employees ensure that electricity flows over long distances reliably, with minimal loss, and optimally managed. As a TSO, we play a central role in the implementation of the energy transition from a technical and economic perspective, acting as a facilitator. Our goal is to integrate 100 percent renewable energy into the grid and system securely and affordably by 2032.
Package Manager Cable Production (HVDC Cables) (f/m/d)
* Full time (37 hours per week)
* Heidestraße 2, 10557 Berlin
* For the next possible date
* Permanent contract
* Job ID: 10923
Original Stellenanzeige mit Gehaltsinformation auf StepStone.de